Service Upgrade in Long Beach, NY

Emergency service upgrade was needed in a pinch when the underground service burned up. To accommodate the client and lower the cost we installed the new service overhead. This service wan done the very next day. PSEG was scheduled and and a new meter was installed... Our client were comfortable for the time without power

By |2016-12-27T19:22:50+00:00July 27th, 2016|Uncategorized|0 Comments

48KW Kohler Generator install in Farmingdale, NY,

In this commercial/Industrial building a generator was a requirement, loss of power is a loss of business. This installation was running 3 phase and 480V. We placed a 48KW Kohler machine on this building. We ran 70 feet of pipe to reach the service panels. We upgraded the gas meter to get the correct BTUs.

By |2016-12-27T19:22:55+00:00July 27th, 2016|Generators|0 Comments

Pharmaceutical Warehouse Lighting Swap in Ronkonkoma, NY

Pharmaceutical warehouse changed lighting throughout entire warehouse.. PSEG Swap for a extreme drop on the electric monthly cost. Converted all lighting to LED with motion sensor technology. All lighting was supplied by PSEG and we added the motion to each fixture. This solution was installed 50 foot high ceilings and with whips to connect to

By |2016-12-27T19:23:00+00:00July 25th, 2016|Uncategorized|0 Comments

Jericho Restaurant Pre Construction

Setting up the Pre Construction of a new restaurant in Jericho, NY. Here we started by setting up temporary lighting for the duration of the job, which is in phase 1. Followed by running 6 inch PVC from the basement to the kitchen area and bar areas. These runs are approximately 70 feet long, with

By |2016-12-27T19:23:05+00:00July 25th, 2016|Uncategorized|0 Comments

Mast Service Upgrade – Freeport, NY

Main service upgrade, old 100 Amp service up upgraded to a new panel supplying 200 amps. Brand new panel, new breakers, new copper wire supplied and installed with a new mast. Everything is inclosed in PVC from box to box. This job was preformed in Freeport New York It meets Nassau counties codes and regulations

By |2016-12-27T19:23:06+00:00July 22nd, 2016|Uncategorized|0 Comments

Industrial Generator Pad – Farmingdale NY

Setting up a generator pad for a industrial Kohler Generator. Pad was framed out set to the ground, concrete structures with reinforced rebar to accommodate the weight of the machine. We also put in scheduled 80 PVC 4 inch pipe, so the wiring will connect with ease. JMEC has preformed this task with great workmanship

By |2016-12-27T19:23:11+00:00July 19th, 2016|Uncategorized|0 Comments

industrial AC/Heater install – Great Neck NY

Industrial Job in Great Neck NY.. * Ran 120 feet of EMT through a garage * Pulling wire for home run circuits * All dedicated line to accommodate the load * Installed shutoff switch and fastened to cement block wall Single unit for building lobby

By |2016-12-27T19:23:13+00:00July 15th, 2016|Uncategorized|0 Comments