Residential 60KW Kohler installed on 600 Amp service in Great Neck
Here we placed a 60KW Kohler Generator and attached it to the entire house.
Here we placed a 60KW Kohler Generator and attached it to the entire house.
Setting up a concrete pad for a Generator in Brookville NY
New LED Light was installed in the peaks of this house in Plandome, NY also known as Manhasset, NY. These peaks were 30 feet high and flooded the area with nice lighting. We added a circuit to the panel and added a switch by the front door. We were able to use the closet as
This is a rough for a apartment in Little Neck, NY. Which we are placing in new lighting, new outlets and bathroom electric. The ceiling is solid concrete and we recessed the boxes for the cleanest look. This is just one (1) of fifteen (15) apartments we are working on in this building. We handle
Commercial Outside Plaza Lighting in Great Neck, NY. Our electricians preformed multiple core drill holes that ranged from 1 inch to 6 inch. We stubbed up conduit in multiple places to create lighingt fixtures in cinder blocks, rebar, and concrete walls. These holes went through over a foot of concrete going through the outside plaza floor
Emergency service upgrade was needed in a pinch when the underground service burned up. To accommodate the client and lower the cost we installed the new service overhead. This service wan done the very next day. PSEG was scheduled and and a new meter was installed... Our client were comfortable for the time without power
In this commercial/Industrial building a generator was a requirement, loss of power is a loss of business. This installation was running 3 phase and 480V. We placed a 48KW Kohler machine on this building. We ran 70 feet of pipe to reach the service panels. We upgraded the gas meter to get the correct BTUs.
Pharmaceutical warehouse changed lighting throughout entire warehouse.. PSEG Swap for a extreme drop on the electric monthly cost. Converted all lighting to LED with motion sensor technology. All lighting was supplied by PSEG and we added the motion to each fixture. This solution was installed 50 foot high ceilings and with whips to connect to
Setting up the Pre Construction of a new restaurant in Jericho, NY. Here we started by setting up temporary lighting for the duration of the job, which is in phase 1. Followed by running 6 inch PVC from the basement to the kitchen area and bar areas. These runs are approximately 70 feet long, with
Main service upgrade, old 100 Amp service up upgraded to a new panel supplying 200 amps. Brand new panel, new breakers, new copper wire supplied and installed with a new mast. Everything is inclosed in PVC from box to box. This job was preformed in Freeport New York It meets Nassau counties codes and regulations