Setting up a generator pad for a industrial Kohler Generator. Pad was framed out set to the ground, concrete structures with reinforced rebar to accommodate the weight of the machine. We also put in scheduled 80 PVC 4 inch pipe, so the wiring will connect with ease. JMEC has preformed this task with great workmanship and high standards. A temporary fence was framed around the concrete so it was not distressed and remained a highly safe area.