48KW Kohler Generator install in Farmingdale, NY,
In this commercial/Industrial building a generator was a requirement, loss of power is a loss of business. This installation was running 3 phase and 480V. We placed a 48KW Kohler machine on this building. We ran 70 feet of pipe to reach the service panels. We upgraded the gas meter to get the correct BTUs.